日本システム企画 東京本社  Official site

Water supply and air conditioning pipe leak prevention! Cost 1/10! NMR Pipe Protector

Piping that has been in use for over 25 years poses a risk of leakage!

Pipe deterioration measures are shifting from "replacement" to "extension of life." The NMR Pipe Protector demonstrates a life extension effect greater than that of pipe replacement at one-tenth the cost. It has numerous implementation records both domestically and internationally, converting existing red rust into passive black rust and extending the life of pipes to match the lifespan of the building. ◆ Features and Benefits - Long-term extension of water supply and air conditioning pipes is possible at about one-tenth the cost of pipe replacement work. - Early installation reduces the cleaning costs of drainage pipes. - No water outage work is required during installation. - Numerous verification data: Prevents red rust in galvanized steel pipes with a lifespan of 20 years in buildings that are 60 years old (Teigeki Building, Yaesu Entrance Hall, Shinjuku Famous Bookstore Building, Liberal Democratic Party Hall). ◆ Implementation Records (partial excerpt) [United Kingdom] Buckingham Palace, BBC, Houses of Parliament, Cambridge University Hospital, etc. [Japan] Japanese Red Cross Hospital, famous hotels, department stores, and many others.

NMR Pipe Protector

basic information

For details, please download the PDF document below. Feel free to contact us.

Price range

Delivery Time

Applications/Examples of results

Over 4,400 installations!

Related Videos

Red rust prevention device for piping "NMR Pipe Protector"

PRODUCT

Easy-to-Understand Basic Knowledge of Piping and Solutions for Rust Problems - Significant Cost Reduction in Repairs Without the Need for Piping Replacement.

TECHNICAL

NMR Pipe Protector Introduction Price Comparison Table

PRICE

Case Studies of NMR Pipe Protectors

TECHNICAL

NMR Pipe Protector Introduction Price Comparison Table (Condominium)

PRICE

NMR Pipe Protector Introduction Price Comparison Table (Hotel)

PRICE

NMR Pipe Protector Introduction Price Comparison Table (Hospitals)

PRICE

NMR Pipe Protector -NMRPT- for preventing red rust in pipes

PRODUCT

Analysis certificate by an external inspection agency / Before installation

OTHER

News about this product(2)

Recommended products

Distributors

~Extending the lifespan of old piping~ "NMR Pipe Protector" Cumulative installation record surpasses 4,400 buildings! (As of July 2025) Among them, over 3,100 buildings are condominiums. = Domestic Achievements = New Chitose Airport Domestic Terminal, JR Sapporo Station (JR Tower Building), Imperial Theatre Building (Tokyo Marunouchi), Yaesu Exit Hall, Famous Bookstore Building (Shinjuku), Hotel Toyokaku (Kyoto), Hotel Serve Shibuya, Shirakagi Care House (Saitama), Kawanishi Private Kushi Elementary School, Food Processing Factory, Major Automobile Manufacturer Factory (Fukuoka Prefecture), Kumamoto Red Cross Hospital, etc. = International Achievements = Buckingham Palace, London City Hall, British Museum, BBC, Christ's College, University of Cambridge, Royal Bank of Scotland, Harrods Department Store, Royal Garden Hotel London, UK Parliament, etc. ★ Featured in the Media "NMR Pipe Protector" ★ Selected as one of the top 10 rust prevention technologies in the world in 2020 and introduced in a U.S. magazine! Case studies and customer testimonials have been featured in many media outlets, including TV Tokyo's "World Business Satellite (WBS)", TOKYO MX's "Corporate Spirit", and specialized newspapers "Condominium Management News" and "Air Conditioning Times".