Factory

Factory
This is an introduction to case studies and recommended information for implementation in factories.
1~4 item / All 4 items
-
[Case Study in the Factory] Completely resolved pipe clogging in a short period, increased productivity!
Introduced in major automobile manufacturers, large DPE factories, and food factories!
last updated
-
[NMR Pipe Protector Verification Results] Food Processing Factory
Suppressing the growth of algae in the cooling tower! Evaporation residue has decreased from 952 mg/l to 499 mg/l.
last updated
-
[NMR Pipe Protector Verification Results] Major Automobile Manufacturer Factory in Fukuoka Prefecture
The amount of black rust increased significantly from 4% to 43.6%! A case where line stoppage was completely prevented.
last updated
-
[NMR Pipe Protector Verification Results] Major DPE Factory
Piping with a statutory useful life of 15 years has been extended by 40 years! Maintaining the condition of the piping without red rust deterioration until 55 years of age.
last updated