What is paint failure that swells a few months later? The importance of moisture management to prevent blisters.
The swelling of the paint film that is not visible at the time of shipment may be caused by moisture residue after pretreatment.
■Cause of Occurrence: Blisters are defects where the paint film swells like a balloon. Even if the product is good at the time of shipment, it may be discovered by the customer weeks or months later. The main causes are moisture retention after pretreatment, oil or rust on the surface of the material, and insufficient drying. Invisible residues foster defects beneath the paint film. ■Truth: No one notices the moment it occurs. Even if it passes visual inspection, if moisture or corrosion factors remain beneath the paint film, it will push the film up from the inside. This is a warning sign of adhesion failure, rust reoccurrence, and paint peeling. The risk for the entire lot is hidden behind a single blister. ■Improvement Measures: Check the drying time before painting, the overlap of parts, and any holes or edges where water may remain, as well as welds. Confirm during the process that no moisture remains on the parts, and also record cleaning, storage time, film thickness, and curing conditions. Please utilize materials that allow you to verify moisture retention, pretreatment, and drying conditions.
basic information
Cause 3 elements: Residual moisture after pretreatment, oil and rust, insufficient drying / Key confirmation points: Holes, edges, welds, overlapping parts / Drying: Confirmation of residual moisture at component temperature / Salt spray test for 1000 hours (JIS Z 2371)
Price range
Delivery Time
Applications/Examples of results
Automotive parts, suspension parts, welded structural parts, long-term storage parts.
Related Videos
catalog(3)
Download All Catalogs
Distributors
We are not just a "subcontracted painting factory." Established in 1958, our company has a foundation of painting technology and also specializes in chemical treatment, stripping, and cleaning, functioning as the "external surface treatment department" in your organizational chart. Based on our philosophy of "preparation is eight-tenths of the work," we emphasize participation from the "upstream process" before the drawings are finalized. We conduct test painting on a wide range of metals and difficult materials, and we produce the entire process from assembly, packaging, to delivery, thereby reducing your management workload. Additionally, by being able to perform zinc phosphate treatment in-house, we achieve stable painting quality. Furthermore, our micro-heating stripping technology, which does not use chemicals, maintains the electrical state of the "jigs (hangers)" that influence painting quality. Our approach of "pre-treatment determines painting quality" ensures the stability of the paint film during mass production. Rather than simply "applying specified standards," we work backwards to achieve optimal painting specifications and prevent scratches during transportation, sparing no effort in thorough discussions from the outset. This diligent preparation is the shortest path to preventing rework and minimizing total costs. From the development stage, please utilize the expertise of our specialists as part of your production line.
