Explaining the relationship between temperature and viscosity that makes it easy to drizzle in summer.
As the temperature rises, the viscosity of the paint decreases and the amount of dripping increases. We will explain the measures against dripping in summer with numbers.
Has the amount of dripping increased since summer? The cause may be a decrease in viscosity due to temperature. With a 10-degree rise in temperature, the viscosity of the paint can decrease by up to 30 percent. ────────────── ■ Cause of occurrence When the temperature rises, the viscosity of the paint decreases, making it more prone to dripping on vertical surfaces and corners. If the discharge amount and film thickness settings remain the same as in winter, the risk of dripping increases in summer. ■ The truth If you continue working without realizing that the viscosity has decreased, dripping will occur repeatedly. Dripping tends to concentrate in the afternoon, during the time when temperatures are highest. ■ Improvement measures During summer, regularly check the viscosity with a viscometer and establish seasonal viscosity standards. Set the film thickness slightly thinner and adjust the spraying distance for vertical surfaces. Please refer to the materials for viscosity management during summer.
basic information
Viscosity management: Seasonal standard setting / Measurement method: Use of Ford cup / Adjustment of vertical spray distance / Reduction of drip occurrence rate
Price range
Delivery Time
Applications/Examples of results
Complex-shaped parts, products with many vertical surfaces, mass production painting in summer.
Related Videos
catalog(3)
Download All Catalogs
Distributors
We are not just a "subcontracted painting factory." Established in 1958, our company has a foundation of painting technology and also specializes in chemical treatment, stripping, and cleaning, functioning as the "external surface treatment department" in your organizational chart. Based on our philosophy of "preparation is eight-tenths of the work," we emphasize participation from the "upstream process" before the drawings are finalized. We conduct test painting on a wide range of metals and difficult materials, and we produce the entire process from assembly, packaging, to delivery, thereby reducing your management workload. Additionally, by being able to perform zinc phosphate treatment in-house, we achieve stable painting quality. Furthermore, our micro-heating stripping technology, which does not use chemicals, maintains the electrical state of the "jigs (hangers)" that influence painting quality. Our approach of "pre-treatment determines painting quality" ensures the stability of the paint film during mass production. Rather than simply "applying specified standards," we work backwards to achieve optimal painting specifications and prevent scratches during transportation, sparing no effort in thorough discussions from the outset. This diligent preparation is the shortest path to preventing rework and minimizing total costs. From the development stage, please utilize the expertise of our specialists as part of your production line.
