What causes paint to become sticky on cold days? Two-component paint and temperature.
When the temperature drops, the curing reaction of two-component paints slows down, leaving a sticky residue. This explains the difference between curing issues that occur during winter's room temperature drying and those in baked coatings.
The parts painted on a cold day are still sticky the next day. Are you shipping them with the same drying time as in summer? 【First, please check here】 □ Using a two-component paint and drying it at room temperature → When the temperature is low, the reaction between the base and hardener slows down. □ Parts painted in the evening are stickier → The cooling at night prevents proper drying. □ Adding too much hardener → The mixing ratio becomes unbalanced, making it harder to cure. 【Why does this happen?】 Many two-component paints specify to avoid painting at temperatures below 5 degrees Celsius. Drying at room temperature is influenced by the seasonal temperatures. 【Measures you can take starting today】 1. Check the specifications of the paint for the minimum temperature and drying time. 2. In winter, extend the drying time or use heat to dry. 3. Consider using powder coating, which is less affected by temperature. 【Free Materials】 The details of powder coating services are summarized in the related catalog "Powder Coating Services." You can download it for free from this page.
basic information
Defect: Poor curing (stickiness). Management items: Temperature during painting, mixing ratio of main agent and hardener, drying time, heated drying. Comparison: Room temperature drying and baked painting.
Price range
Delivery Time
Applications/Examples of results
Metal parts, outdoor equipment, and machine covers that undergo room temperature drying two-component painting. Review of drying conditions in winter and consideration of switching to baked painting.
Related Videos
catalog(1)
Download All CatalogsDistributors
We are not just a "subcontracted painting factory." Established in 1958, our company has a foundation of painting technology and also specializes in chemical treatment, stripping, and cleaning, functioning as the "external surface treatment department" in your organizational chart. Based on our philosophy of "preparation is eight-tenths of the work," we emphasize participation from the "upstream process" before the drawings are finalized. We conduct test painting on a wide range of metals and difficult materials, and we produce the entire process from assembly, packaging, to delivery, thereby reducing your management workload. Additionally, by being able to perform zinc phosphate treatment in-house, we achieve stable painting quality. Furthermore, our micro-heating stripping technology, which does not use chemicals, maintains the electrical state of the "jigs (hangers)" that influence painting quality. Our approach of "pre-treatment determines painting quality" ensures the stability of the paint film during mass production. Rather than simply "applying specified standards," we work backwards to achieve optimal painting specifications and prevent scratches during transportation, sparing no effort in thorough discussions from the outset. This diligent preparation is the shortest path to preventing rework and minimizing total costs. From the development stage, please utilize the expertise of our specialists as part of your production line.
