Example of effectiveness in cooling towers: Elimination of slime problems caused by bacteria and organic matter.
Introducing a case study on cooling water improvement using "Pure Cleaner," suitable for slime issues caused by bacteria and organic matter!
We would like to introduce a case where ceramic equipment and a pure cleaner were installed in the circulation piping of the cooling tower at the Kitz Chino factory. The return piping for the water was designed to directly spray water onto the upper tray and the heat dissipation area, allowing us to monitor changes over time. We confirmed the resolution of slime issues caused by bacteria and organic matter. 【Effects】 ■ Strengthening measures against microorganisms such as Legionella ■ Reduction in chemical usage and management burden ■ Suppression of slime and biofouling *For more details, please download the PDF or feel free to contact us.
basic information
For more details, please download the PDF or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please download the PDF or feel free to contact us.
catalog(1)
Download All CatalogsRecommended products
Distributors
Our company was founded in 1951 and began manufacturing and selling bronze valves. By conducting all processes in-house, from casting to processing, assembly, inspection, and shipping, we have established a system that provides detailed sales services and after-sales support to our customers, achieving high management quality in product technical capabilities, cost competitiveness, and delivery times. Please feel free to contact us if you have any requests.



































