VE case
VE case
About VE cases
1~8 item / All 8 items
-
VA/VE Proposal Examples <Cost Reduction and Improved Workability>
Adopt off-the-shelf parts as much as possible to reduce costs! Actively use resin to improve workability.
last updated
-
Various inspection equipment (e.g., 3D measuring machines)
We are equipped with various inspection facilities, including 3D measuring machines, to ensure a high level of quality!
last updated
-
[Proposal Example] Standardize fastening components in design to improve assembly work efficiency.
It is important for designers to consider the management costs of components when designing!
last updated
-
[Proposal Example] Achieving weight reduction by using aluminum-based materials.
This is a proposal that is possible because we have a horizontal machining center in-house!
last updated
-
[Proposal Example] Actively adopt resin to improve workability.
We will also introduce the benefits of replacing the parts that come into contact with the work with resin!
last updated
-
[Proposal Example] Adopt off-the-shelf parts as much as possible to reduce costs.
We propose replacing with off-the-shelf products or standard items from general manufacturers!
last updated
-
[Proposal Example] In jig design, use standard parts such as colored components for the design.
If it's a generic product, cost reductions of up to about half are possible!
last updated
-
[Example of Proposal] In the manufacturing of mechanical parts, R/C surfaces are indicated on the drawings as appropriate.
Here is an example of a suggestion to instruct to appropriately include the R side and C side!
last updated