Maintenance service

Maintenance service
From material acceptance equipment to wastewater treatment and shipping, we handle all maintenance of the ready-mixed concrete plant.
1~30 item / All 35 items
-

Maintenance Service Information
Proposals for suitable maintenance services tailored to the customer's needs and the site.
last updated
-

Ready-mix concrete plant maintenance service
Experienced and accomplished staff! We handle all maintenance work for concrete plants, which is crucial for stable shipments!
last updated
-

[Use Case] Air Transport Piping Construction (Maintenance)
The straight sections of horizontal and vertical piping are often overlooked! For replacement requests, please contact us.
last updated
-

[Use Case] Inspection of Chain Conveyor
We can propose a planned maintenance schedule to prevent interruptions due to sudden failures!
last updated
-

[Use Case] Introduction of Air Blaster
Introducing a product that crushes materials that have hardened and stuck to the corrugated silo using air!
last updated
-

[Usage Example] Safety Patrol
Our strength lies in our ability to combine various equipment and build systems!
last updated
-

【Usage Example】5000t Silo at Cement Station Site
On-site investigation of equipment using air to send cement from inside the silo to the outside!
last updated
-

[Usage Example] Ready-Mix Concrete Mixer Repair
After removing all the inner liners, weld the liner and attach the mixing blades!
last updated
-

[Use Case] Maintenance of Pinch Valve
The internal rubber sleeve will wear out, so we will replace it and repair the electric actuator!
last updated
-

[Usage Example] Bend Pipe Replacement Work
Since the bend pipe is located at a high position, work will be done using a high-altitude work vehicle and a tow truck!
last updated
-

[Usage Example] Cement Transport Pipeline Restoration Work
We will introduce a case where a cement tanker has entered the port, allowing for the reception of cement to the storage silo!
last updated
-

[Usage Example] Aggregate Hopper Renovation Work
We will introduce a case where a prevention plate was extended sideways to prevent the shovel's bucket from hitting during material input, and the structure was modified to allow for replacement when the plate corrodes!
last updated
-

[Usage Example] Bucket Elevator Drive Motor Replacement Project
We will introduce a case where the motor, drive sprocket, drive chain, and a complete set of covers were replaced!
last updated
-

【Case Study】Colgate Silo Roof Replacement Project
We will introduce a case where a roof with a diameter of 6,000mm was designed, manufactured, and installed in three sections!
last updated
-

【Usage Example】Trommel Renovation Work
We will introduce a case where the trommel was updated and successfully underwent a trial run!
last updated
-

[Use Case] Bug Filter Update Construction
Introducing a case of updating and relocating a bag filter on a cement silo over 5 meters high!
last updated
-

【Use Case】Installation Work of Cubicle Support Frame
We will introduce a case where a cubicle was installed, a rain slope was added to the floor panel, and caulking was used as a measure against rain leakage!
last updated
-

[Usage Example] Mixer Gate Cylinder Replacement Work
We will introduce a case where the replacement of the mixer gate was carried out, resulting in smoother opening and closing!
last updated
-

[Usage Example] New Construction of Powder Mixing and Shipping Equipment
Introducing a case where mixed equipment and screw conveyors were newly installed over a period of two months!
last updated
-

[Use Case] Air Slide Canvas Replacement Work
We will introduce a case where holes were drilled for each bolt and a new canvas was installed!
last updated
-

[Case Study] Rotary Feeder Replacement Work
We will introduce a case where an old rotary feeder was removed and replaced with a new one!
last updated
-

[Use Case] Liquid Storage Tank Replacement Work
We will introduce a case where a liquid tank was transported and installed by weaving between machines!
last updated
-

【Use Case】Cement Transport Piping Bend Pipe Renewal Work
We will introduce a case where scaffolding was assembled around the piping on a stage nearly 20 meters high above the ground for the installation of the piping!
last updated
-

【Use Case】Aggregate Storage Silo Exterior Wall Repair Work
We will introduce a case where a high-altitude work vehicle was used to apply paint by placing steel plates around the area with holes.
last updated
-

[Case Study] Screw Conveyor Renovation Project
We will introduce a case of renewal due to the aging of the screw conveyor!
last updated
-

[Usage Example] Dust Collector Motor and Fan Replacement Work
We will introduce a case of replacing the motor and fan of a dust collector that was generating abnormal noise and vibration!
last updated
-

【Use Case】Stirring Tank Renovation Work
We will introduce a case of installing a new mixing tank due to the aging of the water tank!
last updated
-

[Case Study] Corregate Silo Interior Construction
We will introduce a case where approximately 50 sheets of iron plates, weighing about 37 kg each, were installed for repairs inside the corrugated silo!
last updated
-

[Case Study] Bucket Elevator Chain Replacement Project
We will introduce a case where the chain was replaced due to the progression of wear on the roller, with some areas showing cracks.
last updated
-

[Use Case] Bucket Elevator Upper Sprocket Replacement Work
We will introduce a case where the wear in the valley area progressed, and replacement work was carried out for the aging sprocket!
last updated