メインマーク 【全国対応】/東京・大阪・札幌・仙台・新潟・金沢・名古屋・福岡 Official site

Tilt correction: "Underpinning method" for correcting building tilt.

By performing a jack-up at the top of the steel pipe piles, the tilt of the building is corrected!

"Underpinning Method" This method involves extending steel pipes beneath the foundation of a structure while using the building's own weight as a reaction force. The steel pipe piles are driven into the ground, and by performing a jack-up at the top of the steel pipe piles, the tilt of the building is corrected. Since the steel pipe piles are driven down to the supporting ground and act as support piles, there is no risk of the building settling again. This method is suitable for small to medium-sized structures. 【Features】 ■ Can be implemented even for heavy structures ■ Selection of steel pipe diameter based on load ■ Flexible arrangement of steel pipes *For more details, please refer to the PDF document or feel free to contact us. Toll-free number: 0120-873-835

For more details about the underpinning method, click here.

basic information

【Construction Conditions】 ■Applicable Foundation Shape: All direct foundations ■Construction Depth: Approximately 20m ■Distance Restrictions from Adjacent Land: 50cm or more *For more details, please refer to the PDF materials or feel free to contact us. Toll-Free Number: 0120-873-835

Price information

Please contact us.

Delivery Time

Applications/Examples of results

【Purpose】 ■Correction of building tilt *For more details, please refer to the PDF document or feel free to contact us. Toll-free number: 0120-873-835

[Ground Improvement] Correction of Building Tilt and Ground Improvement Method Directly Under the Building

CATALOG

Settlement Correction / Void Filling: Construction Case Studies - TerraTech Method

OTHER

Construction Modification Work: Case Study Collection of Teratec Method

OTHER

News about this product(4)

Recommended products

Distributors