Teratec Construction Method Case Studies

Teratec Construction Method Case Studies
Here is an introduction to construction case studies.
1~17 item / All 17 items
-
Customer Feedback Vol. 3 Refrigerated Warehouse "Teratec Method"
Introducing a conversation with Ichiyou regarding the floor sinking correction work using the Teratec method.
last updated
-
Customer Feedback Vol. 2 Manufacturing Factory "TerraTech Method"
Introducing a discussion with Akebono Industries, who conducted a floor deflection reduction project using the Teratec method.
last updated
-
Teratec Construction Report: Airport
Elimination of flutter and voids in airport aprons (parking areas)! Introducing TerraTech construction case studies.
last updated
-
Teratec Construction Report: Step Plate
Solving problems caused by sinking and cavities! Case study of cavity filling in footings by Teratech.
last updated
-
[TeraTech Construction Report] Asphalt Paved Road
Solving problems with asphalt paved roads! Introducing examples of void filling and unevenness correction.
last updated
-
Teratec Construction Report: Concrete Paved Road
Solving issues with concrete paved roads! Introducing examples of void filling and unevenness correction.
last updated
-
Teratec Construction Report: Nursing Care Facility
Ensuring the safety of event halls where elderly people gather! Introducing examples of floor sinking correction work.
last updated
-
Construction Report: Hospital
Solving your concerns at the hospital! Introducing case studies of "Mainmark" for subsidence correction and void filling.
last updated
-
Teratec Construction Report: Gymnasium
Solving your problems at the gym! Introducing "TerraTech" case studies for settlement correction and void filling.
last updated
-
Teratec Construction Report: School
Solving problems at school! Introducing "TerraTech" construction examples for settlement correction and void filling.
last updated
-
Teratec Construction Report: Store
Solving your store's problems! Introducing "TerraTech" case studies for settlement correction and void filling.
last updated
-
[TeraTech Construction Report] Warehouse
Solve your warehouse problems! Introducing "TerraTech" case studies for settlement correction and void filling.
last updated
-
Teratec Construction Report: Factory
Solving your factory problems! Introducing "TerraTech" case studies for subsidence correction and void filling.
last updated
-
Settlement Correction and Void Filling: TerraTech Method Case Study Collection Giveaway
Over 4,500 construction projects! With the extension of the lifespan of structures being considered now, the number of projects in factories, warehouses, and stores is rapidly increasing!
last updated
-
Customer Feedback Vol. 1: Warehouse "Teratec Method"
Introducing a discussion with Chuo Packing Transport, who performed subsidence correction of a warehouse using the TerraTech method.
last updated
-
[Currently Offering Free Samples] Case Studies of Floor Leveling Repair Work
We will correct the floor tilt and subsidence without stopping operations! Introducing examples of the "Terra Tech Method" for correcting subsided concrete floors!
last updated
-
Customer Feedback Vol. 4: Rental Space "Teratec Method"
Introducing a conversation with the manager who conducted a floor deflection reduction project using the Teratec method.
last updated