メインマーク 【全国対応】/東京・大阪・札幌・仙台・新潟・金沢・名古屋・福岡 Official site

[TeraTech Construction Report] Warehouse

Solve your warehouse problems! Introducing "TerraTech" case studies for settlement correction and void filling.

We would like to introduce a case where we solved problems related to subsidence and voids in a warehouse using the Teratec method. 【Problem】 We received a consultation from a manufacturer in Ibaraki Prefecture that produces forged parts for automobiles, industrial machinery, and ships. They were experiencing issues with the floor of their mold warehouse sinking, which made it difficult for the movable racks to operate smoothly. Upon measuring the floor where the rails for the movable racks were installed, we found unevenness ranging from +4mm to -27mm. 【Reasons for Choosing Teratec】 - No need to break the floor - Can be constructed while heavy molds are still on the movable racks 【Feedback After Construction】 The unevenness was corrected through the construction, significantly improving work efficiency. *For more details, please refer to the external link page or feel free to contact us. Toll-free number: 0120-873-835

Related Link - https://teretek.jp/plus/case/warehouse

basic information

【Case Overview】 ■ Automated Rack Mold Warehouse  ・Construction Details: Settlement Correction Work  ・Construction Date: November 2016  ・Construction Location: Ibaraki Prefecture  ・Construction Area: 198m2 *For more details, please refer to the external link page or feel free to contact us.  Toll-Free Number: 0120-873-835

Price range

Delivery Time

Model number/Brand name

TerraTech method

Applications/Examples of results

For more details, please refer to the external link page or feel free to contact us. Toll-free number: 0120-873-835

Detailed information

Related Videos

[Guarantee] Overview document for the 10-year warranty service "Teratec Plus 10"

OTHER

[Inclination/Subsidence/Step Difference/Cavity Filling] "TerraTech Method" Correction of subsidence in concrete floor slabs due to ground subsidence or disasters.

PRODUCT

Construction Case Studies: Teratech Method Case Studies Vol. 1

TECHNICAL

Customer Feedback Vol. 1: Chuo Packing Transport Co., Ltd. (Warehouse) "Teratek Method"

OTHER

The first step in factory and warehouse automation starts with floor leveling: Teratec method.

PRODUCT

News about this product(7)

Recommended products

Distributors

The main business activities of Mainmark involve "returning tilted floors and buildings to a level state" and "preventing existing floors and buildings from tilting." We primarily offer the "TerraTech Method," which allows us to level tilted floors without stopping operations, and we provide various construction proposals tailored to our customers' concerns, from investigation to execution. ■ Nationwide responsible construction with over 5,000 completed projects Mainmark has established offices in eight locations across the country and conducts responsible construction nationwide. We serve a wide range of clients, including factories, stores, warehouses, offices, and apartments. ■ Non-disruptive floor tilt and subsidence correction method "TerraTech Method" Our main service, the "TerraTech Method," is a patented technique that injects TerraTech resin (rigid polyurethane foam resin) into concrete floors that have developed tilts, subsidence, steps, or voids due to ground subsidence or earthquakes. The expansion force of the resin levels the sunken floor and fills the voids beneath it. This technology is also registered with the Ministry of Land, Infrastructure, Transport and Tourism's "NETIS," ensuring its reliability. Patent No. 4896949 "Method for Correcting Sunken Floors" NETIS Registration No. "QS-080007"