Teratec Construction Report: Store
Solving your store's problems! Introducing "TerraTech" case studies for settlement correction and void filling.
We would like to introduce a case where we solved problems caused by subsidence and voids at a store using the Teratech method. [Problem] A void was found under the concrete floor of a supermarket in Saitama Prefecture, just one month before its opening. It was also discovered that there was a 34mm height difference at the joints of the concrete floor. [Reason for Choosing Teratech] Due to the limited time before the opening, we were requested to address the issue using our polyurethane injection method. [Feedback After Construction] We performed void filling under the floor and correction of the floor height difference using the Teratech method. The adjustments were made to the millimeter level, resolving the height difference at the floor joints. Additionally, we also have examples of height difference correction work related to the renovation of a large supermarket in the Hokuriku region. [Case Overview] ■ Supermarket - Work performed: Void filling under the floor and height difference correction - Date of work: October 2016 - Location: Saitama Prefecture - Work area: 97m² - Height difference correction: 34mm *For more details, please refer to the external link page or feel free to contact us. Toll-free number: 0120-873-835
basic information
【Other Case Studies】 ■ Large Supermarket ・Construction Details: Pit step correction work due to renovation ・Construction Date: September 2014 ・Construction Location: Hokuriku Region ・Construction Area: 100m2 *For more details, please visit the external link page or feel free to contact us. Toll-Free Number: 0120-873-835
Price range
Delivery Time
Model number/Brand name
TerraTech method
Applications/Examples of results
For more details, please visit the external link page or feel free to contact us. Toll-free number: 0120-873-835
Related Videos
catalog(3)
Download All Catalogs
News about this product(7)
-
Announcement of Participation in "Western Japan Manufacturing Technology Innovation 2025" to be Held in Kokura, Fukuoka in July 2025.
The exhibition "Nihon Manufacturing Technology Innovation 2025," which will be held from July 2 (Wednesday) to July 4 (Friday), 2025, at the West Japan General Exhibition Center, has been confirmed! At "Nihon Manufacturing Technology Innovation 2025," cutting-edge technologies that address various challenges faced by manufacturing sites in the Kyushu and Yamaguchi regions, centered around Kitakyushu, will be showcased. Mainmark will be exhibiting for the first time, introducing the "TerraTech Method," which contributes to safety measures by filling the voids under floors where machinery and equipment are installed, and improving productivity and preventing workplace accidents by correcting floor inclinations. We look forward to welcoming everyone visiting the Ipros manufacturing site. *For more details, please see the announcement below: https://mainmark.co.jp/news/20250522
-
Announcement of participation in "MF-TOKYO 2025" to be held in Tokyo in July 2025.
The exhibition at "MF-TOKYO 2025," which will be held from July 16 (Wednesday) to July 19 (Saturday), 2025, at Tokyo Big Sight, has been confirmed! "MF-TOKYO 2025" is an international exhibition related to forming machinery (presses, sheet metal, forming, automation, and peripheral equipment). Mainmark will be exhibiting for the first time, showcasing safety measures such as floor void filling for heavy machinery and equipment like presses, as well as the "TerraTech Method," which contributes to productivity improvement and prevention of labor accidents by correcting factory floor inclinations. We look forward to welcoming everyone visiting the Ipros manufacturing site. *For more details, please see the announcement below: https://mainmark.co.jp/news/20250529
-
Announcement of participation in "FOOMA JAPAN 2025" to be held in Tokyo in June 2025.
The exhibition at "FOOMA JAPAN 2025," to be held from June 10 (Tuesday) to June 13 (Friday), 2025, at Tokyo Big Sight, has been confirmed! "FOOMA JAPAN 2025" is one of the largest exhibitions in Japan's food industry, aimed at exchanging technologies and information related to food machinery, equipment, and related devices. Mainmark will be exhibiting for the first time independently, showcasing the "TerraTech Method," which contributes to pest control through void filling under floors and improves productivity and prevents workplace accidents by correcting the slope of factory floors! ■ Main topics to be introduced: - Investigation of voids under floors, level surveys of floors, vibration surveys - Void filling method "TerraTech Method" for correcting floor subsidence without stopping operations - Construction to level tilted buildings - Ground improvement work beneath buildings We look forward to welcoming everyone visiting the Ipros manufacturing site. *For more details, please see the announcement below: https://mainmark.co.jp/news/20250418
-
We have published examples of the construction work for the sinking correction project.
We have newly published a case study on our service site for the Teratec method. This is a case of settlement correction work carried out at an electronics retail store in Shiga Prefecture. There were concerns about the sagging of the store floor due to ground subsidence, and we were consulted by the company. We understand that our Teratec method was chosen because it allows for construction without interrupting daily operations. Additionally, the positive feedback from a previous project was also a key point. Our company has extensive experience in settlement measures and void filling work while maintaining daily operations for stores and factories. With eight offices nationwide, we are ready to assist you, so please feel free to contact us if you are facing issues with ground subsidence or voids under your floors. ■ Case Study (Teratec Method Service Site): https://teretek.jp/repo/r181
-
We have published examples of construction work for cavity filling (BCP measures).
We have newly published construction case studies on the service site for the Teratec method. This is a case of filling voids beneath the floor slab conducted near an automatic rack warehouse in Toyama Prefecture. There were concerns about subsidence of the surrounding roads and building floors due to ground subsidence following the Noto Peninsula earthquake, and we received inquiries from clients regarding this issue. We have been informed that the key factor for choosing our Teratec method was its ability to perform "short-term construction without stopping truck traffic." Additionally, the effectiveness of compacting loosened ground has also been highly evaluated. Our company has extensive experience in subsidence countermeasures and void filling work while maintaining daily operations in logistics warehouses and factories. With eight branches nationwide, we are equipped to respond to issues related to ground subsidence and voids beneath floors, so please feel free to contact us if you have any concerns. ■ Construction case studies (Teratec method service site): https://teretek.jp/repo/r180