メインマーク 【全国対応】/東京・大阪・札幌・仙台・新潟・金沢・名古屋・福岡 Official site

Tilt correction: "JOG method" building tilt correction

No need for excavation work on the periphery, resulting in a short construction period! It is possible to construct even large buildings exceeding 10 stories.

The "JOG Method" does not require excavation work on the outer perimeter, resulting in a shorter construction period, and it is a method that does not apply localized forces to the structure. By injecting grout material under the foundation while controlling it with a computer, we can correct any tilting. The formulation of a two-component grout material injected through a double pipe allows us to set the curing time according to the ground and construction environment. We construct improved ground to ensure ground reaction force, and further correct tilting by pressing in quick-setting grout. 【Features】 ■ No excavation work on the outer perimeter is necessary ■ No localized forces act on the structure ■ Applicable for large buildings exceeding 10 stories *For more details, please refer to the PDF document or feel free to contact us. Toll-free number: 0120-873-835

For more details about the JOG method, click here.

basic information

【Construction Conditions】 ■Applicable Foundation Shape: All direct foundations ■Construction Depth: Surface layer ■Distance Limit from Adjacent Land: 0 cm or more *For more details, please refer to the PDF document or feel free to contact us. Toll-Free Number: 0120-873-835

Price information

Please contact us.

Delivery Time

Applications/Examples of results

【Purpose】 ■Correction of building tilt *For more details, please refer to the PDF document or feel free to contact us. Toll-free number: 0120-873-835

[Ground Improvement] Correction of Building Tilt and Ground Improvement Method Directly Under the Building

CATALOG

News about this product(4)

Recommended products

Distributors