メインマーク 【全国対応】/東京・大阪・札幌・仙台・新潟・金沢・名古屋・福岡 Official site

Soil improvement: Correction of building tilt and soil improvement methods directly beneath the building.

Improve the ground directly beneath without destroying the building! Repair the tilted building and create a foundation that won't settle again. Five methods unique to specialized companies.

■Correction of Building Tilt and Ground Improvement Method Directly Under the Building "Comprehensive Catalog" This catalog introduces methods for correcting tilted buildings and creating ground that does not subside again. With extensive experience and knowledge in ground and construction, we can read necessary information from surveys and clarify the causes of subsidence. Based on a comprehensive understanding of various situations, we propose the most suitable methods tailored to your needs. We adopt hybrid methods that combine techniques according to the structural issues of the building, construction conditions, and the underground (ground) situation, providing proposals, designs, and construction that meet diverse needs. 【Featured Methods】 ○ High-Pressure Jet Mixing Method (Small Diameter Type, Medium to Large Diameter Type) ○ Underpinning Method ○ Side Pinning Method (Helical Pile Method) ○ GSIS Method ○ JOG Method For more details, please contact us or download the catalog. Toll-Free Number: 0120-873-835

Welcome to the homepage of Mainmark Corporation.

basic information

【Content】 ○ Five construction methods that meet needs  → High-pressure injection mixing method (small diameter type, medium to large diameter type)  → Underpinning method  → Side pinning method (helical pier method)  → GSIS method  → JOG method ○ Construction achievements ○ Introduction of ground-related products from the Mainmark Group  → Settlement prevention  → Tilt correction  → Improvement of building performance understanding ○ Technology export to overseas  → Tilt correction method for buildings: JOG method  → Ground improvement technology: Jet grouting method ● For more details, please contact us or download the catalog. Toll-free number: 0120-873-835

Price information

Please contact us.

Delivery Time

Applications/Examples of results

For more details, please contact us or download the catalog. Toll-free number: 0120-873-835

Related Videos

[Ground Improvement] Correction of Building Tilt and Ground Improvement Method Directly Under the Building

CATALOG

Settlement Correction / Void Filling: Construction Case Studies - TerraTech Method

OTHER

Construction Modification Work: Case Study Collection of Teratec Method

OTHER

News about this product(4)

Recommended products

Distributors

The main business activities of Mainmark involve "returning tilted floors and buildings to a level state" and "preventing existing floors and buildings from tilting." We primarily offer the "TerraTech Method," which allows us to level tilted floors without stopping operations, and we provide various construction proposals tailored to our customers' concerns, from investigation to execution. ■ Nationwide responsible construction with over 5,000 completed projects Mainmark has established offices in eight locations across the country and conducts responsible construction nationwide. We serve a wide range of clients, including factories, stores, warehouses, offices, and apartments. ■ Non-disruptive floor tilt and subsidence correction method "TerraTech Method" Our main service, the "TerraTech Method," is a patented technique that injects TerraTech resin (rigid polyurethane foam resin) into concrete floors that have developed tilts, subsidence, steps, or voids due to ground subsidence or earthquakes. The expansion force of the resin levels the sunken floor and fills the voids beneath it. This technology is also registered with the Ministry of Land, Infrastructure, Transport and Tourism's "NETIS," ensuring its reliability. Patent No. 4896949 "Method for Correcting Sunken Floors" NETIS Registration No. "QS-080007"