メインマーク 【全国対応】/東京・大阪・札幌・仙台・新潟・金沢・名古屋・福岡 Official site

Floor sinking correction, void filling under the floor, and building tilt correction work in Asian countries.

We accept inquiries about floor sinking correction, void filling under the floor, and building tilt correction work in Asian countries such as Thailand, Vietnam, and Indonesia.

We provide technical support for construction work such as settlement correction at overseas factories of Japanese corporations. Our Japanese staff will assist you from investigation and construction planning to construction management, ensuring that the quality of construction is the same as in Japan. For more details, please contact us by phone. Toll-free number: 0120-873-835

Technical support for Mainmark overseas.

basic information

■Countries where technical support is available Thailand, Vietnam, Indonesia, Malaysia, Singapore, Myanmar ■Types of construction work that can be performed 1) Ground floor subsidence and void countermeasures Using Mainmark's patented method "TerraTech Method," we address subsidence and voids in ground floors. The TerraTech Method involves injecting a rigid polyurethane resin called "TerraTech Resin" beneath the concrete ground floor, which expands to fill voids and level the sunken floor. This patented method allows for the correction of sloping or subsided concrete ground floors without breaking the floor or relocating equipment, achieving a "zero downtime" solution. We have completed over 4,200 projects since our establishment. 2) Building tilt correction work At Mainmark, which employs first-class architects and experts in architecture, civil engineering, geotechnics, and structural/vibration analysis, we can also solve issues related to building tilt overseas. Please feel free to contact us. Toll-free number: 0120-873-835

Price range

Delivery Time

Model number/Brand name

TerraTech method

Applications/Examples of results

【Construction Achievements】 ■Factory Construction Location: Thai Binh Province, Vietnam Construction Area: 19,500 square meters Adjustment Amount: 100–120mm Construction Duration: Approximately 14 months ■Office within Factory Construction Location: West Java, Indonesia Construction Area: 360 square meters Adjustment Amount: 100mm Construction Duration: 3 days Other Construction Achievements Additionally, there are construction achievements at Gimpo Airport in South Korea, a home center in Australia, and a factory in New Zealand. *For more details, please refer to the PDF document or feel free to contact us.

Related Videos

Floor subsidence correction, void filling under the floor, and building tilt correction work in Asian countries.

COMPANY

[Inclination/Subsidence/Step Difference/Cavity Filling] "TerraTech Method" Correction of subsidence in concrete floor slabs due to ground subsidence or disasters.

PRODUCT

Total Solution of Mainmark

COMPANY

Teratec Construction Method Catalog [For Overseas: English]

CATALOG

News about this product(4)

Recommended products

Distributors