メインマーク 【全国対応】/東京・大阪・札幌・仙台・新潟・金沢・名古屋・福岡 Official site

The first step in warehouse automation is the "Terra Tech Method" from the level of the floor.

Currently, with the advancement of delivery management and warehouse automation utilizing AI and big data, the levelness of the facility's floor is an important theme for the introduction of automation equipment.

If the floor is not level... ☑ The installation of high-rise racks will require liner support, causing anxiety! ☑ There is a possibility that high-pick operators may fall, making it unusable! ☑ There may be obstacles to the operation of AGVs (automated guided vehicles)! ☑ High stacking of pallets and nestainers may become tilted and impossible! The "TerraTech Method" levels the floor's tilt and subsidence in a short construction period. ◆ What is the TerraTech Method? Is your warehouse's concrete floor tilted or sunken? The TerraTech Method involves injecting TerraTech resin beneath the concrete floor, using its expansion force to return the sunken floor to level and fill any voids underneath. This patented method corrects the "tilt," "sinking," "steps," and "deflection" of the concrete floor without damaging it, and does so in a short period. Please feel free to contact us. Toll-free number: 0120-873-835

■Take a closer look at the Teratec method.

basic information

◆Features of the Teratec Method - Does not damage the floor - Short construction period - Patent obtained - Over 4,200 construction achievements In traditional floor replacement or addition, the construction period for introducing automated equipment takes 30 days, but with the Teratec method, it only takes 1 day! Achieving significant reduction in construction time! If you are troubled by a sloping floor, please contact us immediately. We will respond promptly. Toll-free number: 0120-873-835

Price information

It varies depending on the sinking amount and the cavity amount. Please feel free to contact us.

Delivery Time

Please contact us for details

First, we will conduct an investigation: measuring the floor's tilt and surveying the amount of voids under the floor.

Model number/Brand name

TerraTech Method

Applications/Examples of results

【Main Construction Sites】 Stores: Shopping centers, large retail stores, convenience stores, pachinko parlors, restaurants Warehouses: General warehouses, distribution centers, logistics hubs, cold storage warehouses, platforms Factories: Various manufacturing plants, food factories, cold rooms, inspection rooms Schools: Classrooms, gymnasiums, auditoriums, kitchens Public Works: Roads, pedestrian bridges, various airport facilities, schools, community centers 【Main Clients】 ▼ Government Agencies Kanto Regional Development Bureau, Ministry of Land, Infrastructure, Transport and Tourism Chubu Regional Development Bureau, Ministry of Land, Infrastructure, Transport and Tourism Kinki Regional Development Bureau, Ministry of Land, Infrastructure, Transport and Tourism Chugoku Regional Development Bureau, Ministry of Land, Infrastructure, Transport and Tourism Kyushu Regional Development Bureau, Ministry of Land, Infrastructure, Transport and Tourism Hokuriku Regional Development Bureau, Ministry of Land, Infrastructure, Transport and Tourism Tokyo Aviation Bureau, Ministry of Land, Infrastructure, Transport and Tourism Tokyo Metropolitan Government, First Construction Office Iwate Prefecture, Department of Land Development Aomori Prefecture, Shimokita Regional Bureau Kyoto Prefecture, Civil Engineering Office Chiba Prefecture, Sewerage Corporation ▼ Private Companies Obayashi Corporation Kajima Corporation Taisei Corporation Takenaka Corporation Shimizu Corporation Daiwa House Industry Co., Ltd. Toda Corporation Mitsui Sumitomo Construction Co., Ltd. Ando & Associates Tokyu Construction Co., Ltd. Goyo Construction Co., Ltd. Maeda Corporation Fujita Corporation Nishimatsu Construction Co., Ltd. NIPPO Corporation

Related Videos

Line up(1)

Model number overview
001 Teratech Method: Floor and building subsidence correction work caused by ground subsidence

[Inclination/Subsidence/Step Difference/Cavity Filling] "TerraTech Method" Correction of subsidence in concrete floor slabs due to ground subsidence or disasters.

PRODUCT

The first step in factory and warehouse automation starts with floor leveling: Teratec method.

PRODUCT

Total Solution of Mainmark

COMPANY

Construction Case Studies: Teratech Method Case Studies Vol. 1

TECHNICAL

Pest Control: Teratek Method (TERETEK)

PRODUCT

Customer Feedback Vol. 1: Chuo Packing Transport Co., Ltd. (Warehouse) "Teratek Method"

OTHER

Customer Voice Vol. 3: Oruichi Co., Ltd. (Refrigerated Warehouse) "Teratek Method"

OTHER

News about this product(7)

Recommended products

Distributors