The first step in automating factories and warehouses starts with floor leveling [with case studies included].
With the advancement of factory and warehouse automation using FA machines and AGVs, the leveling of facility floors has become a "mandatory requirement" for equipment installation.
Have you ever experienced this? If the floor is not level... ■ It affects the precision of robots in packaging and boxing operations! ■ The installation of high-rise racks becomes a concern for liner compatibility! ■ There is a risk of high-level picking vehicles tipping over and becoming unusable! ■ There may be obstacles to the operation of AGVs (automated guided vehicles)! ■ High stacking of pallets and nestainers becomes tilted and impossible! ≪The 'Teratec Method' levels out floor inclinations and subsidence in a short construction period.≫ ◆ What is the 'Teratec Method'? Is your factory or warehouse's concrete floor sloped or sunken? The Teratec Method is a patented technique that injects Teratec resin under the concrete floor, using its expansion force to return the sunken floor to level and fill any voids beneath the floor. It corrects the "tilt," "subsidence," "steps," and "deflection" of concrete floors without breaking them, achieving a level surface in a short time.
basic information
◆Features of the Teratec Method - No damage to the floor - Short construction period - Patent obtained - Over 4,500 construction achievements In general, when replacing or adding to a floor, the construction period for introducing automated equipment takes 30 days. ◎ With the 'Teratec Method', the construction period can be as short as 1 day! There is no need to move existing equipment, achieving significant reductions in construction time! If you are troubled by floor sagging or tilting, please contact us immediately. We will respond promptly. Toll-free number: 0120-873-835
Price information
It varies depending on the sinking amount and the cavity amount. Please feel free to contact us.
Delivery Time
Model number/Brand name
TerraTech method
Applications/Examples of results
**Main Construction Sites** Factories: Various manufacturing plants, food factories, freezing rooms, inspection rooms Warehouses: General warehouses, distribution centers, logistics hubs, cold storage warehouses, platforms Stores: Shopping centers, large retail stores, convenience stores, pachinko parlors, restaurants Schools: Classrooms, gymnasiums, auditoriums, cafeterias Public Works: Roads, pedestrian bridges, various airport facilities, schools, community centers **Main Clients** ▼ Government Agencies Ministry of Land, Infrastructure, Transport and Tourism Kanto Regional Development Bureau Ministry of Land, Infrastructure, Transport and Tourism Chubu Regional Development Bureau Ministry of Land, Infrastructure, Transport and Tourism Kinki Regional Development Bureau Ministry of Land, Infrastructure, Transport and Tourism Chugoku Regional Development Bureau Ministry of Land, Infrastructure, Transport and Tourism Kyushu Regional Development Bureau Ministry of Land, Infrastructure, Transport and Tourism Hokuriku Regional Development Bureau Ministry of Land, Infrastructure, Transport and Tourism Tokyo Aviation Bureau Tokyo Metropolitan Government, First Construction Office Iwate Prefecture, Land Development Department Aomori Prefecture, Shimokita Regional Citizens Bureau Kyoto Prefecture, Civil Engineering Office Chiba Prefecture, Sewerage Corporation ▼ Private Companies Obayashi Corporation Kajima Corporation Taisei Corporation Takenaka Corporation Shimizu Corporation Daiwa House Industry Co., Ltd. Toda Corporation Sumitomo Mitsui Construction Co., Ltd. Ando & Associates Tokyu Construction Co., Ltd. Goyo Construction Co., Ltd. Maeda Corporation Fujita Corporation Nishimatsu Construction Co., Ltd. NIPPO Corporation
Related Videos
Line up(1)
Model number | overview |
---|---|
001 | Teratec construction method - Floor and building subsidence correction work caused by ground subsidence |
catalog(6)
Download All Catalogs