メインマーク 【全国対応】/東京・大阪・札幌・仙台・新潟・金沢・名古屋・福岡 Official site

TerraTech method for correcting tilts, subsidence, and level differences in floors and buildings: Case study collection giveaway.

We solve problems such as ground improvement and ground strengthening under buildings, mainly through settlement correction and void filling work using the Terra Tech method! We have surpassed 4,500 construction achievements.

●What is the Teratech Method… It is a patented method that involves injecting rigid polyurethane foam "Teratech resin" under concrete floors to fill voids and level sunken floors using its expansion force. Since it does not require breaking the floor, operations can continue without moving shelves or machinery! ▼Various issues we have resolved 【Tilt】 - Struggling with uneven factory floors. Want to make the concrete floor flat. - The warehouse floor has sunk in a bowl shape, causing vibrations during forklift operation. - The area where machines are installed has sunk, causing tilting of the machines. 【Subsidence】 - Found tilting in the foundation, making repairs impossible. - The concrete floor of the school gymnasium has sunk, except for the underground beams. - There are depressions on the warehouse floor, raising concerns about product storage and worker safety. 【Step Differences】 - There are step differences in the floor, causing product defects such as loads falling. - There is a step at the entrance of the refrigerated warehouse, making it difficult for forklifts to pass. 【Hollows and Gaps】 - The vibrations from the machines have worsened. I would like to check for any voids. - Cracks have appeared under the floor. We are struggling with corrosion of stored items and pest infestations. - Due to flooding, the soil under the concrete has been washed away, creating voids.

Related Link - https://www.teretek.jp/about

basic information

■Various Experts in Different Fields Our company has a range of experts, including first-class architects with extensive experience, specializing in architecture, civil engineering, ground conditions, liquefaction, and structural vibrations. We propose construction methods tailored to your needs from a wide variety of materials. If it is difficult to resolve an issue with a single method due to the condition of the building or your concerns, we suggest a combination of methods for the construction. ■Appropriate Investigation Costs Before carrying out construction, we conduct an investigation of the site conditions and propose methods that address the issues you wish to resolve. Investigation fee: Basic fee of 50,000 yen (excluding tax) + actual transportation costs *Additional costs may apply depending on the location and conditions of the site. [Void Volume Investigation] We drill several holes with a diameter of 16 mm in the floor slab and use an endoscope to measure the thickness of the floor slab and the volume of voids beneath it. In addition to understanding the current situation, we perform measurements necessary for the construction plan, such as calculating the amount of resin to be used. [Settlement (Level) Investigation] Using surveying equipment, we measure the height of the floor slab and quantify the amount of settlement and deflection of the floor. The measured values are used to set target values for corrections and to create the construction plan. Please feel free to contact us. Toll-free number: 0120-873-835

Price information

Please feel free to contact us. Toll-free number: 0120-873-835

Delivery Time

Model number/Brand name

TerraTech method

Applications/Examples of results

**Main Clients** ▼ Government Agencies Ministry of Land, Infrastructure, Transport and Tourism Kanto Regional Development Bureau Ministry of Land, Infrastructure, Transport and Tourism Chubu Regional Development Bureau Ministry of Land, Infrastructure, Transport and Tourism Kinki Regional Development Bureau Ministry of Land, Infrastructure, Transport and Tourism Chugoku Regional Development Bureau Ministry of Land, Infrastructure, Transport and Tourism Kyushu Regional Development Bureau Ministry of Land, Infrastructure, Transport and Tourism Hokuriku Regional Development Bureau Ministry of Land, Infrastructure, Transport and Tourism Tokyo Aviation Bureau Tokyo Metropolitan Government, First Construction Office Iwate Prefecture, Department of Land Development Aomori Prefecture, Shimokita Regional Bureau Kyoto Prefecture, Civil Engineering Office Chiba Prefecture, Sewerage Public Corporation ▼ Private Companies Obayashi Corporation Kajima Corporation Taisei Corporation Takenaka Corporation Shimizu Corporation Daiwa House Industry Co., Ltd. Toda Corporation Sumitomo Mitsui Construction Co., Ltd. Ando Corporation Tokyu Construction Co., Ltd. Goyo Construction Co., Ltd. Maeda Corporation Fujita Corporation Nishimatsu Construction Co., Ltd. NIPPO Corporation

Related Videos

Settlement Correction / Void Filling: Construction Case Studies - TerraTech Method

OTHER

Construction Modification Work: Case Study Collection of Teratec Method

OTHER

News about this product(7)

Recommended products

Distributors