富士ファーマナイト Official site

[Pharmise Construction Case] Released the stuck gate valve in 30 minutes!

Resolve troubles and disadvantages caused by conventional sticking valve measures!

Here is a case study of our product. During regular maintenance of the boiler, a valve was closed, and when it was time to reopen it towards the end of the repair, it became stuck. Since there was not enough time to arrange for a replacement or alternative work, we decided to try our product. The valve in question has a horizontally extending stem. To prevent the VRT from falling, it was securely fixed, and vibrations were applied to the stuck valve using a linear motion vibrator. We successfully released the stuck valve in 0.5 hours, making it operable again. 【Gate Valve】 ■ Size: 6B ■ Pressure: 1.6MPa ■ Fluid: Steam ■ Temperature: Approximately 200℃ *For more details, please download the PDF or feel free to contact us.

Related Link - https://www.furmanite.co.jp/

basic information

【Benefits of Pharmize】 ■ Repairs can be made while the equipment is operating without the need for disassembly ■ Low risk as no excessive force is applied to the valve ■ No restrictions on valve type, fluid, pressure, or temperature *For more details, please download the PDF or feel free to contact us.

Price range

Delivery Time

Applications/Examples of results

For more details, please download the PDF or feel free to contact us.

[PharmEyes Materials] No disassembly required! Release the sticking of the 'gate valve' in 30 minutes! Introduction of construction examples.

TECHNICAL

Recommended products

Distributors