富士ファーマナイト Official site

[Pharmacies Construction Case] Released 5 stuck valves in 2 days!

Solve various troubles and disadvantages caused by conventional sticking valve measures!

We would like to introduce the construction achievements of Farmers at a geothermal power plant. At a certain geothermal power plant, while attempting to close a valve, it was discovered that more than five valves were stuck. All the stuck valves identified this time were gate valves. The fluid was steam, with a pressure of 0.02 MPa and a temperature of 102°C. After the work, we completed a total of five tasks in two days and were able to release all the stuck valves. [Case Summary] ■ Issues - While attempting to close the valves, it was discovered that more than five valves were stuck. - We wanted to avoid an emergency shutdown of the geothermal power plant due to valve disassembly and maintenance. ■ Solution - We completed a total of five tasks in two days and were able to release all the stuck valves. *For more details, please download the PDF or feel free to contact us.

Related Link - https://www.furmanite.co.jp/

basic information

【Benefits of Pharmize】 ■ Repairs can be made while the equipment is operating without the need for disassembly ■ Low risk as no excessive force is applied to the valve ■ No restrictions on valve type, fluid, pressure, or temperature *For more details, please download the PDF or feel free to contact us.

Price range

Delivery Time

Applications/Examples of results

For more details, please download the PDF or feel free to contact us.

[Pharmice Materials] Released 5 fixed valves at the geothermal power plant in 2 days! Introduction of construction examples.

TECHNICAL

Distributors

Recommended products