日本システム企画 東京本社  Official site

  • PRODUCT

The case study of the introduction of Lions Mansion Koshigaya North was featured in the specialized newspaper "Mansion Management News," issue No. 1182, dated September 25, 2021.

日本システム企画

日本システム企画 東京本社 

The September 25, 2021 issue of "Mansion Management Newspaper" No. 1182 featured an article about the NMR Pipe Protector. The "Lions Mansion Koshigaya North" located in Koshigaya City, Saitama Prefecture, introduced the NMR Pipe Protector in November 2010. Kunio Kitazawa, who was the chairman of the condominium management association at the time, stated, "It has been exactly six years since we introduced it this November. According to the endoscopic inspection, there is no sign of red rust growth, and there is a slight contraction in volume, so we believe that black rust formation is progressing." The long-term repair plan had proposed lining work, but by introducing the NMR Pipe Protector, the actual cost was about one-third of the lining work, allowing the management association to effectively utilize the repair reserve fund for projects such as upgrading lighting fixtures to LED. Mr. Kitazawa mentioned, "A large-scale repair project is scheduled for next year or the year after, and the elevator updates will also be on the schedule. Since the cost of introducing the pipe protector was lower than the board had anticipated, we can allocate funds for these expenses as well."

Specialized newspaper "Mansion Management News" September 25, 2021, Issue No. 1182
NMR Pipe Protector

Related Links

NMR Pipe Protector
Official site of Nippon System Planning Co., Ltd.

Related catalog

Effect verification of black rust due to red rust in the water supply pipe of Coop Nomura Minami Ishikiri condominium.

OTHER

Cosmo Kajigaya Le Seine Mansion Water Supply Pipe Effect Verification of Red Rust to Black Rust Conversion

OTHER

Easy-to-Understand Basic Knowledge of Piping and Solutions for Rust Problems - Significant Cost Reduction in Repairs Without the Need for Piping Replacement.

TECHNICAL

"Methods for Reducing Repair Costs of Hotel Air Conditioning Ducts" was published in the June 25, 2021 issue of "HOTERES" (Weekly Hotel Restaurant)!

OTHER

NMR Pipe Protector Introduction Price Comparison Table

PRICE

January 1, 2019 "Air Conditioning Times" published at the Imperial Theatre

TECHNICAL

January 22, 2020 "Air Conditioning Times" published at Yaesu Entrance Hall

TECHNICAL

July 18, 2018 "Air Conditioning Times" published _St. Ignatius Church

TECHNICAL

Implementation results at Kumamoto Red Cross Hospital

TECHNICAL

Red rust prevention device for piping "NMR Pipe Protector"

PRODUCT

Case Studies of NMR Pipe Protectors

TECHNICAL

Calcium scale solidification adhesion prevention device "Non-Scaler"

PRODUCT