ミナギ Official site

Installation General Example: φ1000 Hopper (2)

Introduction of general examples for the installation of the bridge breaker "Brodisk"!

This is an introduction to general examples of installing the bridge breaker "Brodisk." The pressure of the air slightly lifts the perimeter of the elastic disk, allowing powerful air to be ejected 360° along the tank's wall. At the same time, the elastic disk vibrates, directly imparting vibrations to the bulk material. This combined effect of "wall air aeration" and "vibration" resolves bulk material issues. For more details, please contact us or download the catalog. 【Key Points of This Equipment】 ■ The elastic disk (silicone) is very important in terms of strength and durability, especially considering the risk of foreign material contamination. Our silicone disk has excellent strength and durability. Once you use it, you will understand! ■ Control (how to aerate?) is crucial! We provide guidance on what should be done. We also have a dedicated controller available.

Related Link - https://www.mi-nagi.co.jp/2010/04/00131000.html

basic information

【General Installation Examples】 ○ Generally, the BD-15 type (standard) with the least amount of air is used. ○ The installation position is typically 300 mm above the hopper wall along the discharge section. ○ In this case, a controller with one solenoid valve simultaneously turns the air ON/OFF for three blow discs. ○ For more details, please feel free to consult us. If you provide the hopper diagram and type of powder, we will suggest the optimal position. ● For more details, please contact us or download the catalog.

Price information

Please contact us.

Delivery Time

Applications/Examples of results

For more details, please contact us or download the catalog.

General installation example for φ1000 hopper (2)

TECHNICAL

Flow of introducing powder blockage prevention equipment: Brody Disk

TECHNICAL

Distributors

Recommended products