General installation example for φ500 hopper
Introduction of general examples for the installation of the bridge breaker "Brodisk".
This is an introduction to the general application case of the bridge breaker "Brodisk" installation. The pressure of the air slightly lifts the perimeter of the elastic disk, allowing powerful air to be ejected 360° along the tank's wall. At the same time, the elastic disk vibrates, directly imparting vibrations to the bulk material. This combined effect of "wall air aeration" and "vibration" resolves bulk material issues. For more details, please contact us or download the catalog. 【Key Points of This Equipment】 ■ The elastic disk (silicone) is very important in terms of strength and durability due to the risk of foreign material contamination. Our silicone disk is exceptionally strong and durable. Once you use it, you will understand! ■ Control (how to aerate?) is crucial! We provide guidance on what should be done. We also have a dedicated controller available.
basic information
【General Installation Examples】 ○ Generally, the BD-15 type (standard) with the least air volume is used. ○ The installation position is typically 300 mm above the hopper wall along the discharge section. ○ In this case, due to the gentle tank slope (45 degrees), relatively small tank diameter, and small discharge outlet diameter (less than φ100), it is installed 150 mm above the discharge section. ○ Additionally, in this case, a controller with one built-in solenoid valve simultaneously turns the air ON/OFF for three blow discs. ○ For more details, please feel free to consult us. If you provide the hopper diagram and type of powder, we will suggest the optimal position. ● For more information, please contact us or download the catalog.
Price information
Please contact us.
Delivery Time
Applications/Examples of results
For more details, please contact us or download the catalog.