General installation example for φ700 hopper
Introduction of general examples for the installation of the bridge breaker "Brodisk".
This is an introduction to general examples of installing the bridge breaker "Brodisk." The pressure of the air slightly lifts the perimeter of the elastic disk, allowing powerful air to be ejected 360° along the tank's wall. At the same time, the elastic disk vibrates, directly imparting vibrations to the bulk material. This combined effect of "wall air aeration" and "vibration" resolves bulk material issues. For more details, please contact us or download the catalog. 【Key Points of This Equipment】 ■ The elastic disk (silicone) is very important in terms of strength and durability, especially considering the risk of foreign matter contamination. Our silicone disk is exceptionally strong and durable. Once you use it, you will understand! ■ Control (how to aerate?) is crucial! We provide guidance on what should be done. A dedicated controller is also available.
basic information
【General Installation Examples】 ○ Generally, the BD-15 type (standard) with the least air volume is used. ○ The installation position is typically 300 mm above the hopper wall along the discharge section. ○ In this case, since the tank diameter is relatively small, it is installed slightly lower at a position of 200 mm. ○ Additionally, in this case, a controller with one built-in solenoid valve is used to simultaneously turn the air ON/OFF for two blow discs. ○ For more details, please feel free to consult us. If you provide us with the hopper diagram and type of powder, we will suggest the optimal position. ● For more details, please contact us or download the catalog.
Price information
Please contact us.
Delivery Time
Applications/Examples of results
For more details, please contact us or download the catalog.