ミナギ Official site

0242 Installed in the cement bin of the concrete plant.

Easily solve powder bridges that cannot be resolved with knockers or vibrators.

This is an introduction to a case where a bridge breaker was installed in the cement bin of a concrete plant. Due to the issues with the cement input position and the inclination of the bin, residual cement adhered to one side of the rectangular cement bin. As a result of consultations, the problem was resolved by installing five units of our standard equipment, the BD-15S-B, on that side. [Bin Dimensions, etc.] ■ Top: Approximately 1000×800 ■ Bottom: Approximately 250×250 ■ Inclination of the installation surface: About 50° This bridge breaker can be easily installed by simply drilling a hole in the hopper wall. Additionally, since it is a low-cost device, the expenses remain limited even when multiple units are installed. *For more details, please refer to the catalog or feel free to contact us. *We have published numerous implementation examples on our website, which can be checked via the link below.

Related Link - https://www.mi-nagi.co.jp/2016/12/0242.html

basic information

【Specifications】 ■ Brody Disk BD-15S-B, 5 pieces 【Key Points of This Equipment】 ■ The elastic disk (silicone) is very important in terms of the risk of foreign matter contamination, as well as strength and durability. The silicone disk of this equipment is exceptionally strong and durable. Once you use it, you will understand! ■ Control (how to aerate?) is important! We provide guidance on what should be done. A dedicated controller is also available. *For more details, please refer to the catalog or feel free to contact us. TEL: 06-6777-2777

Price range

Delivery Time

Applications/Examples of results

We have published numerous examples on our company website. Please feel free to contact us.

Related Videos

Case Studies on Powder Bridge Prevention

TECHNICAL

Flow of introducing powder blockage prevention equipment: Brody Disk

TECHNICAL

Recommended products

Distributors