ミナギ Official site

0308 Biomass Power Plant

Introducing the case of the Brody disk adopted for bridge measures in fuel air transport systems.

This is an introduction to a case where "Brody Disk" was adopted in a wood biomass power generation plant. It addresses the bridging issue in the cyclone lower hopper of the fuel air transport system. After installing this equipment, bridging no longer occurred, and we received positive feedback from the customer regarding the improved operation. 【Overview of Operating Conditions】 ■ Hopper Diameter: 1400φ ■ Outlet Diameter: 250A ■ Material: Wood biomass fuel (fluffy, less than 10mm) ■ Configuration: 4 units installed in 2 layers in the above hopper (total of 8 units) ■ Operation: Air ON in a staggered manner, 2 units at a time at 4 locations * For more details, please refer to the PDF document or feel free to contact us. * Our website features numerous implementation examples. You can check them through the link below.

Related Link - https://www.mi-nagi.co.jp/2018/02/0308.html

basic information

【Product Specifications】 ■ Brody Disk BD-15S-B x 8 ■ Controller C-SV4 x 1 【Key Points of This Equipment】 ■ The strength and durability of the elastic disk (silicone) are very important from the perspective of foreign matter contamination risk. The silicone disk of this equipment is exceptionally strong and durable. Once you use it, you will understand! ■ Control (how to aerate?) is important! We provide guidance on what should be done. A dedicated controller is also available. *For more details, please refer to the PDF document or feel free to contact us. TEL: 06-6777-2777

Price range

Delivery Time

Applications/Examples of results

We have published numerous examples on our company website. Please feel free to contact us.

Related Videos

Case Studies on Powder Bridge Prevention

TECHNICAL

Flow of introducing powder blockage prevention equipment: Brody Disk

TECHNICAL

Distributors

Recommended products