ミナギ Official site

0135 Bridge measures for limestone powder, promoting outflow

Elimination of bridges in large silos of limestone powder! Troubles resolved with multiple arrangements.

As a bridge countermeasure for the large silo of limestone powder, 32 units of the standard type of bridge and rat hole breaker, "Bro-Disk," model BD-15, have been installed. First, 8 units were installed at a position 450mm diagonally above the silo wall along the discharge outlet. The second row consists of another 8 units positioned 600mm above the first row, with the third and fourth rows arranged similarly. The aeration sequence was turned ON sequentially for every 8 units starting from the bottom row. 【Overview】 ■ Discharge outlet diameter: 450A ■ Hopper angle: approximately 60° 【Key Points of This Equipment】 ■ The elastic disk (silicone) is very important in terms of strength and durability, especially considering the risk of foreign material contamination. The silicone disks of this equipment are exceptionally strong and durable. Once you use it, you will understand! ■ Control (how to aerate?) is crucial! We provide guidance on what should be done. A dedicated controller is also available. *For more details, please refer to the PDF materials or feel free to contact us. *Our website features numerous implementation examples, which can be checked via the link below.

Related Link - https://www.mi-nagi.co.jp/2014/05/0135.html

basic information

■Brodisk: BD-15-B 32 pieces ■Controller: C-6 1 unit *For more details, please refer to the PDF document or feel free to contact us. TEL: 06-6777-2777

Price range

Delivery Time

Applications/Examples of results

*We have published numerous examples on our company website. Please feel free to contact us.*

Related Videos

Case Studies on Powder Bridge Prevention

TECHNICAL

Flow of introducing powder blockage prevention equipment: Brody Disk

TECHNICAL

Recommended products

Distributors