Preventing bridging and rat holes in the hopper before the drying process.
Introducing a case of quicklime bridge in a poor liquidity state and measures taken against rat holes!
We implemented a Brody disk to address the issues of bridging and rat holes in slaked lime with poor flowability before the drying process. This time, it was delivered to the user through a powder system manufacturer. Originally, it was planned to use an air knocker, but at the request of the user, who manufactures a wide range of lime-related products, our bridging and rat hole mitigation equipment was adopted. 【Case Overview】 ■ Material: Slaked lime ■ Moisture content: Approximately 10 percent ■ Hopper diameter: 2000 mm ■ Discharge outlet diameter: 250 mm * For more details, please refer to the PDF document or feel free to contact us. * Our website features numerous case studies, which can be accessed via the link below.
basic information
【Specifications】 ■Brodie Disk: BD-15S-B, 8 pieces ■Controller: C-SV4, 1 piece 【Key Points of This Equipment】 ■The strength and durability of the elastic disk (silicone) are very important from the perspective of foreign matter contamination risk. The silicone disk of this equipment is exceptionally strong and durable. Once you use it, you will understand! ■Control (how to aerate?) is crucial! We provide guidance on what should be done. A dedicated controller is also available. *For more details, please refer to the PDF document or feel free to contact us. TEL: 06-6777-2777
Price range
Delivery Time
Applications/Examples of results
*We have published numerous examples on our company website. Please feel free to contact us.*