ミナギ Official site

0336 Bridge breaker for cement supply hopper

Measures to address occasional blockages in the cement hopper of a concrete plant!

As a measure against occasional blockages that occur in the cement hopper of the concrete plant, we have adopted our bridge breaker, the "Brodisk." It was reported that supply had been unstable due to seasonal factors and other reasons. However, more than a year has passed since the installation of this equipment, and there have been no issues at all. 【Overview】 ■ Hopper diameter: 1200φ ■ Discharge diameter: 300φ 【Key Points of This Equipment】 ■ The elastic disk (silicone) is very important in terms of the risk of foreign material contamination, as well as strength and durability. The silicone disk of this equipment excels in strength and durability. We believe you will understand this once you use it! ■ Control (how to aerate?) is crucial! We provide guidance on what should be done. A dedicated controller is also available. * For more details, please refer to the PDF materials or feel free to contact us. * Our website features numerous implementation examples. You can check them out through the link below.

Related Link - https://www.mi-nagi.co.jp/2018/07/0336.html

basic information

【Product Specifications】 ■ Bro-Disk BD-15S-B 4 pieces ■ Controller C-SV4 1 unit *For more details, please refer to the PDF document or feel free to contact us. TEL: 06-6777-2777

Price range

Delivery Time

Applications/Examples of results

*We have published numerous examples on our company website. Please feel free to contact us.*

Case Studies on Powder Bridge Prevention

TECHNICAL

Flow of introducing powder blockage prevention equipment: Brody Disk

TECHNICAL

Recommended products

Distributors