ミナギ Official site

0565 Promoting the outflow of silica sand

We provide guidance on recommended configurations and installation! We have received high praise for cases where we can now discharge in a shorter time than before.

We received an inquiry from a customer who wants to install our equipment near the discharge area of a large tank. (Based on the user's experience, they believe this measure alone is sufficient.) After discussing various conditions, we provided a recommended layout and proceeded with the installation, and we have received high praise for being able to discharge in a shorter time than before. 【User Conditions】 ■ Target Material: Silica sand (specific gravity: 1.7, size: approximately 1mm average, moisture: a few percent) ■ Hopper Inclination: Approximately 50° ■ Discharge Diameter: Ø200 【Layout and Quantity】 ■ Installed 4 units in 2 tiers at varying heights near the discharge area. 【Key Points of Our Equipment】 ■ The elastic disk (silicone) is very important in terms of the risk of foreign material contamination, as strength and durability are crucial. The silicone disk of our equipment is exceptionally strong and durable. We believe you will understand this once you use it! ■ Control (how to aerate?) is important! We provide guidance on what should be done. We also have a dedicated controller available. *For more details, please refer to the PDF document or feel free to contact us.

Related Link - https://www.mi-nagi.co.jp/2022/07/0565.html

basic information

【Product Specifications】 ■ Brody Disk BD-15S-B 8 pieces *For more details, please refer to the PDF document or feel free to contact us.

Price range

Delivery Time

Applications/Examples of results

For more details, please refer to the PDF document or feel free to contact us.

Case Studies on Powder Bridge Prevention

TECHNICAL

Flow of introducing powder blockage prevention equipment: Brody Disk

TECHNICAL

Recommended products

Distributors