ミナギ Official site

Installed BD-20 with a large amount of air [titanium oxide].

A case where measures were implemented to address the very poor liquidity of "titanium oxide."

We would like to introduce a case study of our "Brodisk" installation. As a measure against bridging of titanium dioxide in a Φ800 hopper, resin lining was applied and an air knocker was installed. However, this was not a complete solution, and in the new hopper being introduced, resin lining will be applied, and by replacing the air knocker with our equipment, the customer's issue was resolved. 【Case Overview】 ■ Hopper Diameter: Φ1300 ■ Discharge Diameter: Φ300 ■ Target Powder: TiO2 ■ Equipment Configuration: 4 Brodisk (BD-20) units arranged in 2 tiers, totaling 8 units (the lower and upper tiers are positioned at a 45° rotation to each other and installed in a staggered arrangement) *For more details, please download the PDF or feel free to contact us.

Related Link - https://www.mi-nagi.co.jp/2024/10/0683bd-20.html

basic information

【Product Specifications】 ■ Brody Disk Mini BD-08S-F 8 pieces ■ Controller C-SV1 1 unit *For more details, please download the PDF or feel free to contact us.

Price range

Delivery Time

Applications/Examples of results

For more details, please download the PDF or feel free to contact us.

Case Studies on Powder Bridge Prevention

TECHNICAL

Flow of introducing powder blockage prevention equipment: Brody Disk

TECHNICAL

Recommended products

Distributors