SINKPIA・JAPAN Official site

[Installation Example] Hakone Hotel Kowakien

Reducing 45 tons of waste per month! Significant reduction in waste disposal costs along with CO2 reduction.

We would like to introduce a case where the commercial food waste processor "Sinkpia GJ-500" was installed at Hakone Hotel Kowakien. This product has been introduced in various locations, resulting in a total reduction of 45 tons of waste per month across three sites. The hotel has successfully reduced waste and CO2 emissions, while also contributing to a significant decrease in waste disposal costs. [Case Overview] ■ Installation Location: Hakone Hotel Kowakien ■ Installed Product: Commercial Food Waste Processor "Sinkpia GJ-500" *For more details, please download the PDF or feel free to contact us.

Related Link - https://sinkpia-j.co.jp/example/2023_0914/

basic information

For more details, please download the PDF or feel free to contact us.

Price range

Delivery Time

Applications/Examples of results

For more details, please download the PDF or feel free to contact us.

[Comprehensive Catalog] Commercial Food Waste Processor Sink Pia

CATALOG

[Concept Catalog] Commercial Food Waste Processor Sink Pia

COMPANY

What kind of food waste processor is Sinkpia?

OTHER

[SINKPIA + SDGs] Commercial Food Waste Processor Sinkpia

OTHER

News about this product(1)

Distributors

Recommended products