SINKPIA・JAPAN Official site

[Installation Example] Gunma University Hospital

Custom model linked to a crusher! A case study of installing our commercial food waste processor in a hospital.

We would like to introduce a case where our commercial food waste processor "Sinkpia GJ-300" was installed at Gunma University Hospital. Sinkpia processes food waste on-site through biodegradation using the power of microorganisms, without the need for transportation or incineration. Previously, it was necessary to remove the processed waste, but now, as it liquefies food waste in about 24 hours, there is no need for removal, unlike composting or drying types. We offer a product lineup ranging from 1-ton class to 20 kg types. 【Case Overview】 ■ Installation Location: Gunma University Hospital ■ Installed Equipment: Sinkpia GJ-300 ■ Product Details: Custom model linked with a crusher *For more details, please download the PDF or feel free to contact us.

Related Link - https://sinkpia-j.co.jp/example/0604_update/

basic information

For more details, please download the PDF or feel free to contact us.

Price range

Delivery Time

Applications/Examples of results

For more details, please download the PDF or feel free to contact us.

[Comprehensive Catalog] Commercial Food Waste Processor Sink Pia

CATALOG

[Concept Catalog] Commercial Food Waste Processor Sink Pia

COMPANY

What kind of food waste processor is Sinkpia?

OTHER

[SINKPIA + SDGs] Commercial Food Waste Processor Sinkpia

OTHER

News about this product(1)

Recommended products

Distributors