[Installation Example] Lala Chance Garden Tokyo Bay
Biodegradation treatment using the power of microorganisms! Leave the processing of organic waste to us.
We have installed our commercial food waste processor "Sink Pia GJ-50" at Lalaciance Garden Tokyo Bay. This product allows for food waste to be processed "without transporting, burning, or removing it." Previously, it was necessary to remove the processed waste, but now, it liquefies food waste in about 24 hours, eliminating the need for removal, unlike composting or drying methods. As long as the processing capacity is not exceeded, additional food waste can be added. Specialized microorganisms for the food waste processor inhabit the microbial carrier at high density within the processing tank, and by being stirred appropriately, the biodegradation efficiency is improved, allowing for a more compact device. [Case Overview] ■ Installation Location: Lalaciance Garden Tokyo Bay ■ Installed Equipment: Sink Pia GJ-50 *For more details, please download the PDF or feel free to contact us.
basic information
For more details, please download the PDF or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please download the PDF or feel free to contact us.