メインマーク 【全国対応】/東京・大阪・札幌・仙台・新潟・金沢・名古屋・福岡 Official site

  • OTHER

We have published examples of the construction work for the sinking correction project.

メインマーク

メインマーク 【全国対応】/東京・大阪・札幌・仙台・新潟・金沢・名古屋・福岡

We have newly published a case study on our service site for the Teratec method. This is a case of settlement correction work carried out at an electronics retail store in Shiga Prefecture. There were concerns about the sagging of the store floor due to ground subsidence, and we were consulted by the company. We understand that our Teratec method was chosen because it allows for construction without interrupting daily operations. Additionally, the positive feedback from a previous project was also a key point. Our company has extensive experience in settlement measures and void filling work while maintaining daily operations for stores and factories. With eight offices nationwide, we are ready to assist you, so please feel free to contact us if you are facing issues with ground subsidence or voids under your floors. ■ Case Study (Teratec Method Service Site): https://teretek.jp/repo/r181

We have extensive repair experience in environments where it is difficult to stop operations, such as stores and factories.

Related Links

[Construction Case No.181] Subsidence Repair Work for Home Appliance Retail Store | Teratek Method Teratek Method [Quickly Resolving Floor and Ground Issues]

Related catalog

[Inclination/Subsidence/Step Difference/Cavity Filling] "TerraTech Method" Correction of subsidence in concrete floor slabs due to ground subsidence or disasters.

PRODUCT

Customer Feedback Vol. 2: Akebono Sangyo Co., Ltd. (Manufacturing Plant) "Teratek Method"

OTHER

Customer Voice Vol. 3: Oruichi Co., Ltd. (Refrigerated Warehouse) "Teratek Method"

OTHER

Customer Feedback Vol. 1: Chuo Packing Transport Co., Ltd. (Warehouse) "Teratek Method"

OTHER

[Construction Case] Funabori Co., Ltd. (Manufacturing Factory) "Teratech Method"

PRODUCT

Total Solution of Mainmark

COMPANY

The first step in factory and warehouse automation starts with floor leveling: Teratec method.

PRODUCT

Settlement Correction / Void Filling: Construction Case Studies - TerraTech Method

OTHER

[Guarantee] Overview document for the 10-year warranty service "Teratec Plus 10"

OTHER

Construction Case Studies: Teratech Method Case Studies Vol. 1

TECHNICAL

[Case Studies of Safety Measures] Leveling a Tilted Floor in a Short Time! Teratec Method

PRODUCT

Pest Control: Teratek Method (TERETEK)

PRODUCT