メインマーク 【全国対応】/東京・大阪・札幌・仙台・新潟・金沢・名古屋・福岡 Official site

  • OTHER

Announcement of participation in "FOOMA JAPAN 2025" to be held in Tokyo in June 2025.

メインマーク

メインマーク 【全国対応】/東京・大阪・札幌・仙台・新潟・金沢・名古屋・福岡

The exhibition at "FOOMA JAPAN 2025," to be held from June 10 (Tuesday) to June 13 (Friday), 2025, at Tokyo Big Sight, has been confirmed! "FOOMA JAPAN 2025" is one of the largest exhibitions in Japan's food industry, aimed at exchanging technologies and information related to food machinery, equipment, and related devices. Mainmark will be exhibiting for the first time independently, showcasing the "TerraTech Method," which contributes to pest control through void filling under floors and improves productivity and prevents workplace accidents by correcting the slope of factory floors! ■ Main topics to be introduced: - Investigation of voids under floors, level surveys of floors, vibration surveys - Void filling method "TerraTech Method" for correcting floor subsidence without stopping operations - Construction to level tilted buildings - Ground improvement work beneath buildings We look forward to welcoming everyone visiting the Ipros manufacturing site. *For more details, please see the announcement below: https://mainmark.co.jp/news/20250418

This is the first time that the main mark is exhibiting alone.

Related Links

Announcement of Participation in "FOOMA JAPAN 2025" to be Held in Kanazawa in June 2025 | Mainmark Corporation [Ground Improvement Works]
Detailed information regarding the exhibition is provided.

Related catalog

Pest Control: Teratek Method (TERETEK)

PRODUCT

[Inclination/Subsidence/Step Difference/Cavity Filling] "TerraTech Method" Correction of subsidence in concrete floor slabs due to ground subsidence or disasters.

PRODUCT

[Ground Improvement] Correction of Building Tilt and Ground Improvement Method Directly Under the Building

CATALOG

Monitoring the structural integrity of buildings 365 days a year using fine vibration data [log365 Building Structure Monitoring]

PRODUCT

The first step in factory and warehouse automation starts with floor leveling: Teratec method.

PRODUCT

Teratech Construction Method - Case Study Collection

CATALOG

[Tread Plate / Void Filling Under Roads] "TerraTech Method (TERETEK)"

PRODUCT

Teratec Construction Method Catalog [For Overseas: English]

CATALOG

Construction Case Studies: Teratech Method Case Studies Vol. 1

TECHNICAL

[Case Studies of Safety Measures] Leveling a Tilted Floor in a Short Time! Teratec Method

PRODUCT

[Guarantee] Overview document for the 10-year warranty service "Teratec Plus 10"

OTHER

Customer Feedback Vol. 2: Akebono Sangyo Co., Ltd. (Manufacturing Plant) "Teratek Method"

OTHER

Customer Voice Vol. 3: Oruichi Co., Ltd. (Refrigerated Warehouse) "Teratek Method"

OTHER

Customer Feedback Vol. 1: Chuo Packing Transport Co., Ltd. (Warehouse) "Teratek Method"

OTHER

Customer Feedback Vol. 4: Rental Space "Teratec Method"

TECHNICAL

"Void filling" with the option to choose between permeable and impermeable 'cement-based lightweight' filling and embankment construction methods.

PRODUCT

[Construction Case] Funabori Co., Ltd. (Manufacturing Factory) "Teratech Method"

PRODUCT

Total Solution of Mainmark

COMPANY

Highway and Road Construction Case Studies: Terratec Method

OTHER

Vibration Mitigation Construction Case Studies: Teratec Method

OTHER

Settlement Correction / Void Filling: Construction Case Studies - TerraTech Method

OTHER

Construction Modification Work: Case Study Collection of Teratec Method

OTHER

[Automobile Maintenance Workshop: Case Study] Teratec Method

OTHER

Vibration Survey Service

PRODUCT

Floor subsidence correction, void filling under the floor, and building tilt correction work in Asian countries.

COMPANY